Przejdź do treści

From one-off prototypes to 10 000-pair runs, our 120-machine playground removes tooling risk, slashes lead-times and keeps IP on EU soil.

Technology that turns bold footwear ideas into sellable product – fast, in Europe.

Zero-tooling cutting: from DXF to uppers in minutes

  • Upload your DXF before lunch → get real leather parts the same day.
  • Swiss Zünd dual-head plotters cut any pattern; MOQ = 1 (great for half-sizes & A/B tests).
  • QR-coded nests feed traceability right into our ISO 9001 dashboard

Półbut trekkingowy TAPI C - 9219 - różowa skóra nubukowa - TAPI nero - Półbuty trekkingowe damskie - Różowy - 3

DIY roadmap to 2× sewing throughput

Template robots = complex uppers, Asian cost

  • ±0.1 mm repeatability on 20-piece trekking uppers.
  • Decorative stitches that were €4+ labour drop to cents – design freedom with no price penalty.
  • Same operator can switch to manual station in 30 s → no idle hands.

Lasting & Automated Cement Line

From hand-skill variance to robot-level consistency

Smart lasting duo (Cerim K-78 + Molina Mk2)

Hydraulic force + programmable glue path; no staples ⇒ waterproof builds pass EN ISO 20345 first time.

CD3 buff-cement cell

€4 chip revival now runs 50 pairs/hr, cutting cement-line head-count in half and airborne dust to < 0.5 mg/m³.

Seamless uppers, supercritical mid-soles, V-Label microfibres – made under one roof

We combine Santoni 3-D circular knitting, superctistical outsoles and V-Label / OEKO-TEX® certified micro-fibres. Result: lighter shoes, 30 % less waste and marketing-ready sustainability claims.

Choose the build, we spin the machines

Seamles kniting

String lasting

Strobel

Waterproof strobel

Stroble + lasting

Hybrid strobel

Moccasin

Lasted

MOQ 50 per colour with on-site finishing

Finishing Lab & Laser Personalisation

Numbers that Matter

120

Active machines on the floor
+ over 100 machines in storage. Possibility to create separeate assembly line just for your product (often required by military production).

8

Shoe-construction systems mastered.

7-14 d

Prototype lead-time.

<0.1 %

Claim rate 2024

want a tech-feasibility check on your design?

Schedule a call